How to Price a Pool BuildCost Categories, Markup vs Margin & Allowances

October 8, 20269 min readBy the Ardovia team

To price a pool build, estimate the full cost of every category — excavation, steel, plumbing, electrical, shotcrete, tile and coping, decking, interior finish, equipment, permits, and job-specific overhead — then set the selling price with a target margin: price = cost ÷ (1 − margin %). Add allowances at their face value outside your margin math, and keep material costs current with supplier pricing so the number you quote is the number you earn.

How do pool builders price a pool?

Pool builders price a pool by building it on paper first. You break the job into cost categories, estimate quantities and costs for each, add the costs of running your business, and then apply a markup or margin to reach the selling price.

The two ways it goes wrong are missing costs and the wrong math. A forgotten haul-off or a markup mistaken for a margin can quietly eat a large share of the profit you planned.

The rest of this guide walks through both: what to include, and how to turn cost into price.

Pool cost categories to estimate

Estimate each category from the design, site visit, and your current supplier and subcontractor pricing. Typical drivers are listed so you know what to measure.

CategoryWhat it coversWhat drives the cost
Design & engineeringPlans, engineering, surveysPool complexity, site, jurisdiction
Permits & feesBuilding permit, HOA fees, utility feesLocal fee schedules
Excavation & haul-offDig, grading, soil removalVolume, access, soil and rock
SteelRebar, forming, steel laborShell size and engineered spec
PlumbingPipe, fittings, drains, returns, laborRun length to the pad, number of features
ElectricalPower to the pad, bonding, lighting circuitsDistance to panel, panel capacity, features
Shotcrete / guniteShell material and applicationShell surface area and thickness
Tile & copingWaterline tile, coping, setting laborPerimeter length and material choice
DeckingConcrete, pavers, or stone and laborSquare footage and material
Interior finishPlaster, aggregate, or other finishSurface area and finish type
EquipmentPump, filter, heater, sanitation, automation, lightsModel selections and features
Start-up & cleanupFill, chemicals, start-up visits, cleanupPool volume and your process
Job overheadSupervision, equipment rental, dumpsters, portable toiletJob length and site needs

Company overhead — office, insurance, vehicles, sales commission — is covered by your margin or by percentage operating expenses, explained below.

Markup vs margin: the formulas

Markup is profit as a percentage of cost. Margin is profit as a percentage of the selling price. They use the same dollars but different denominators, so the same percentage gives you different prices.

  • Price with markup: price = cost × (1 + markup %)
  • Price with margin: price = cost ÷ (1 − margin %)
  • Convert markup to margin: margin % = markup % ÷ (1 + markup %)
  • Convert margin to markup: markup % = margin % ÷ (1 − margin %)

Worked example: markup vs margin (hypothetical numbers)

Suppose a hypothetical pool's estimated cost is $50,000 and you want to earn 35%. Here is what happens depending on which math you use.

MethodCalculationPriceGross profitActual margin
35% markup$50,000 × 1.35$67,500$17,50025.9%
35% margin$50,000 ÷ 0.65$76,923$26,92335.0%

All figures are hypothetical and rounded. The point: a 35% markup is only about a 26% margin. If your business needs a 35% margin, applying a 35% markup under-prices this job by about $9,400.

Which should you use?

Margin is usually the better target for setting price, because your overhead and profit goals are naturally a share of revenue. If you know your company needs a certain percentage of every sale to cover overhead and profit, price to that margin.

Markup is still common for individual catalog items and subcontractor pass-throughs. That is fine, as long as you check the blended margin on the whole job before you send the proposal.

Whichever you use, be consistent. Mixing the two across estimators is one of the easiest ways to end up with jobs that look profitable on paper and are not.

Gross margin vs net margin: account for operating expenses

Gross margin is price minus job cost. Net margin also subtracts the expenses that scale with each sale, such as sales commission, financing fees, warranty reserves, or a company overhead percentage.

If commission is a percentage of the sale, a hypothetical $76,923 job at 35% gross margin and an 8% commission keeps about 27% after commission. Model these expenses on every job so you know your true net, and set a minimum margin you will not quote below.

How to handle allowances in a pool price

An allowance is a budget amount for something the customer has not chosen yet — landscaping, a fence by others, or upgraded lighting. It is included in the contract total, and the final amount is reconciled once the customer chooses.

Allowances are pass-through money. Add them to the customer's total at face value, but keep them out of cost, margin, and profit calculations — and do not apply commission percentages to them. Otherwise a large allowance inflates your apparent margin and your commissions.

Hypothetical example: a $76,923 pool plus a $5,000 landscaping allowance is an $81,923 contract. Your margin is still calculated on the $76,923 pool, not on $81,923.

Spell out how overages and savings are handled in the contract. Our construction proposal template has example allowance wording.

Step by step

Build pricing templates and assemblies

Most pool builders sell variations of the same build. Pricing templates turn your estimating knowledge into a repeatable system.

  1. 1

    Group costs into assemblies

    Bundle the items that always go together. A "pool shell" assembly might include excavation, steel, and shotcrete, with quantities calculated from length, width, and depth.

  2. 2

    Drive quantities from a few inputs

    Use formulas so perimeter, surface area, and volume calculate from the dimensions you enter. Tile, coping, finish, and start-up chemicals then price themselves.

  3. 3

    Turn choices into selections

    Equipment, finishes, and decking materials become dropdowns with their own costs. The salesperson picks the option and the price updates.

  4. 4

    Set guardrails

    Define a minimum margin, standard draw schedule, and default allowances, so every proposal follows the same rules no matter who builds it.

Keep prices current with supplier pricing

A pricing template is only as good as the costs inside it. Equipment, tile, and other materials change price, and a template built on last year's costs can erode margin on every job.

Review supplier price lists on a regular schedule, update the items you use most, and give every proposal an expiration date so you are not honoring old prices indefinitely. When costs move, re-check the margin on proposals that are still open.

Change orders need the same discipline. Decide whether a change order is priced at today's supplier cost or at the price locked in when the contract was signed, and apply that rule every time. See our change order template.

Pool estimating in Ardovia

Ardovia's pricing tool lets you build formula-driven pricing templates from sections, objects, and products linked to your catalog. Catalog items can be priced by markup, margin, or a flat price, with location-specific pricing for multiple branches and a price history for every change.

Allowance items are added to the contract total but always excluded from cost, margin, and profit, and templates can set minimum and warning net margins that include operating expenses like commission. The Heritage distributor integration links catalog items to Heritage products and syncs branch-level pricing, with each change written to price history; SCP / Pool360 is coming soon. Learn more about pool builder estimating software.

Pricing / Templates / Gunite Pool
Pool StructureSection
Gunite ShellObject
InputsCalculatedProductsOutput
Pool Length{poolLength}Number
Pool Width{poolWidth}Number
Shell Finish{finish}Selection
Gunite · qtyround(area / 9, 2)

Built for contractors

Run your contracting business in one place

Ardovia handles leads, proposals, change orders, scheduling, permits, and job costing for pool builders and contractors.

Book a Demo

Frequently asked questions

How do you calculate the price of a pool build?

Estimate the total cost of every category — design, permits, excavation, steel, plumbing, electrical, shotcrete, tile and coping, decking, interior finish, equipment, start-up, and job overhead. Then divide the total cost by one minus your target margin. For example, a hypothetical $50,000 cost at a 35% margin gives a price of $50,000 ÷ 0.65, or about $76,923. Add allowances separately at face value.

What is the difference between markup and margin?

Markup is profit as a percentage of cost; margin is profit as a percentage of the selling price. A 35% markup on a $50,000 cost gives a $67,500 price, which is only about a 26% margin. To earn a 35% margin, the price must be $50,000 ÷ 0.65, or about $76,923. The numbers here are hypothetical.

Should allowances include profit?

No. Allowances are pass-through budget amounts for items the customer has not chosen yet. They are added to the contract total at face value but should be excluded from cost, margin, profit, and commission calculations. Any overage or savings is reconciled with a change order or credit once the final choice is made.

What overhead should be included in a pool estimate?

Include job-specific overhead directly in the estimate, such as supervision, equipment rental, dumpsters, and portable toilets. Cover company overhead — office staff, insurance, vehicles, software — through your target margin, and model sale-based expenses like commission as a percentage of the sale so you can see your net margin.

How often should pool builders update their pricing?

Review supplier pricing on a regular schedule and whenever a major supplier announces changes, and update the items you use most first. Give every proposal an expiration date so old pricing is not honored indefinitely, and re-check margins on open proposals after costs change.